Carlisle SynTec Systems

EPDM, TPO, PVC, FleeceBACK, Insulation

CONTACT INFO
P. O. Box 7000
Carlisle, PA 17013
Continuing Education Logo
Request for informationCarlisle SynTec Systems Contact Us / RFI

Carlisle SynTec Systems CAD DetailsSearch using keywords: concrete footing schedule

U-6B EPDM - Roof Drain - Reinforced Field Sheet with Sump Exceeding 3" per foot

U-13B EPDM - Built-Up Roofing Tie-In Over Concrete Roof Decking

U-13D EPDM - EPDM Tie-In Over Concrete Deck

U-6A PVC-TPO - Roof Drain (Drain Sump Up to 3" to 1 Horizontal foot)

U-6B PVC-TPO - Roof Drain (Drain Sump Greater than 3" to 1 Horizontal foot)

U-6C PVC-TPO - Roof Drain (Drain Sump Greater than 3" to 1 Horizontal foot) - Option 2, Page 1 of 2

U-6C and U-6C.1 PVC-TPO - Roof Drain (Drain Sump Greater than 3" to 1 Horizontal foot) - Option 2, Page 1 of 2

U-6C.1 PVC-TPO - Roof Drain (Drain Sump Greater than 3" to 1 Horizontal foot) - Option 2, Page 2 of 2

U-13B TPO - TPO Tie-In to Built-Up Roofing Over Concrete Roof Deck

U-13E TPO - EPDM Tie-In on Concrete Deck

U-13G PVC - PVC/KEE HP Tie-In to Existing Single-Ply Roof Membranes on Concrete Deck