Carlisle SynTec Systems CAD DetailsSearch using keywords: metal decking sw maintenance
B-3A EPDM - Deck-to-Deck Expansion Joint
U-1F EPDM - Metal Bar Edge Termination
U-3A EPDM - Deck-to-Deck Expansion Joint
U-3B EPDM - Deck-to-Wall Expansion Joint
U-5E EPDM - New Self-Flashing Metal Curb
U-6D EPDM - Insert Drain Through Deck
U-13A EPDM - Built-Up Roofing Tie-In Over Steel Roof Decking
U-13B EPDM - Built-Up Roofing Tie-In Over Concrete Roof Decking
U-13D EPDM - EPDM Tie-In Over Concrete Deck
U-13E EPDM - Tie-In Shingled or Metal Panel Roof
U-18A EPDM - Metal Scupper at Deck
U-20B EPDM - Lightning Rod at Deck Level
FB-1C.1 - Metal Bar Edge Termination
FB-3A.1 - Deck-to-Deck Expansion Joint
FB-3B.1 - Deck-to-Wall Expansion Joint
FB-18B.1 - Through-Wall Scupper with SecurWeld or Sure-Flex Metal
FB-25.1 - Simulation of Metal Roof in Thermoplastic Membranes
U-1C PVC-TPO - Metal Bar Edge Termination
U-3A PVC-TPO - Deck-to-Deck Expansion Detail
U-3B PVC-TPO - Deck-to-Wall Expansion Detail
U-5B PVC-TPO - Curb Flashing with TPO or PVC Coated Metal
U-12A PVC-TPO - Parapet Flashing - Fastened Into Deck
U-12C PVC-TPO - Coated Metal Wall Flashing
U-13A TPO - TPO Tie-In to Built-Up Roofing Over Steel Roof Deck
U-13B TPO - TPO Tie-In to Built-Up Roofing Over Concrete Roof Deck
U-13E TPO - EPDM Tie-In on Concrete Deck
U-13F PVC-TPO - TPO/PVC Tie-In to Shingled or Metal Panel Roof
U-13G PVC - PVC/KEE HP Tie-In to Existing Single-Ply Roof Membranes on Concrete Deck
U-13H PVC - PVC/KEE HP Tie-In to Existing Single-Ply Roof Membranes on Metal Deck
U-15C PVC-TPO - Inside Corner with Coated Metal Wall Flashing
U-15F PVC-TPO - Outside Corner Flashing with Coated Metal Wall Flashing
U-18A PVC-TPO - Scupper with Coated Metal
U-18B TPO - Scupper at Deck - TPO
U-20B PVC-TPO - Lighting Rod at Deck Level